The q50-value over one hour is used to describe the air leakage (or air infiltration rate) of a building envelope at a pressure difference of 50 Pascals (Pa). This standard is related to the rate that air infiltrates the whole envelope of a building when doors and windows are closed thus the volume is calculated to include everything within the envelope or the air tightness line.
This is measured through a q50 pressure test which is carried out by closing and sealing doors and windows and installing a door blower to create a pressure differential of 50 Pa (equivalent to a 5 mm water column) between the inside and outside, to measure the air leakage. The standard (or q50) and the UK building regulations requires a test result which is less than 5m3 of air per hour per m2 of floor area @ 50 Pascals expressed as < 5m3/hm2@50pa. Note that the volume of the building is based on the total volume within the building envelope as opposed to the sum of the volume of all internal rooms as is used for the Passivhaus standard.
[edit] Related articles on Designing Buildings
- Accredited construction details ACDs.
- Air change rates.
- Air permeability testing.
- Air pressure n50 test.
- Air tightness in buildings
- Airtightness of energy efficient buildings.
- Draughts in buildings.
- Energy audit.
- Floor plenum airtightness.
- Indoor air quality.
- Indoor air velocity.
- Passivhaus.
- Site inspections.
- Thermographic survey.
- The history of non-domestic air tightness testing.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.